REINFORCING YOUR FUTURE
SINCE 1979

+35391524518
sales@dominiclydon.ie
Ince Park Biomass Power Resources Recovery Centre
Ince Park Biomass Power Resource Recovery Centre (20MW Plant), located in Cheshire on a previously undeveloped site.
Ince Park Biomass Power Resources Recovery Centre

Project Details

Ward & Burke were responsible for the design and build civils works for Ince Park Biomass Power Resource Recovery Centre (20MW Plant), located in Cheshire on a previously undeveloped site. Completion of further site investigation allowed for detailed design of the piling matt and piled foundations.


  • Works included;
  • Site clearance.
  • Design and build 24,000m2 of a piling matt x 1.2m thick with 4 layers of geogrid. Equating to 60,000t stone.
  • Design and build piled foundations which involved the installation of over 1100 number 350 square precast concrete piles x 16.5m to 17.5m deep.
  • Design and construction of fuel reception building, gasification building and turbine hall and admin building.

Â

Scroll to Top